Scheduling production of multiple part-types in a system with pre-known demands and deterministic inactive time intervals
From MaRDI portal
Publication:958115
DOI10.1016/J.EJOR.2008.01.033zbMath1180.90117OpenAlexW2010061772MaRDI QIDQ958115
Rafael Pastor, Albert Corominas
Publication date: 2 December 2008
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2008.01.033
Cites Work
- Constraint-based scheduling: Applying constraint programming to scheduling problems.
- Optimal control of failure-prone manufacturing systems with constant repair times
- Satisfiability tests and time-bound adjustments for cumulative scheduling problems
- Scheduling multiple part-types in an unreliable single-machine manufacturing system
- Scheduling manufacturing systems with work-in-process inventory control: multiple-part-type systems
- Failure-prone production systems with uncertain demand
- Optimal PHP production of multiple part-types on a failure-prone machine with quadratic buffer costs
- Optimal control for systems with deterministic production cycles
This page was built for publication: Scheduling production of multiple part-types in a system with pre-known demands and deterministic inactive time intervals