A note on the proportionate flow shop with a bottleneck machine
From MaRDI portal
Publication:958116
DOI10.1016/j.ejor.2008.01.031zbMath1176.90225OpenAlexW1980763491MaRDI QIDQ958116
Christos P. Koulamas, Kyparisis, George J.
Publication date: 2 December 2008
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2008.01.031
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (4)
Minimizing makespan in an ordered flow shop with machine-dependent processing times ⋮ Two-machine flow shop scheduling problem with an outsourcing option ⋮ A note on makespan minimization in proportionate flow shops ⋮ Flow shops with machine maintenance: ordered and proportionate cases
Cites Work
This page was built for publication: A note on the proportionate flow shop with a bottleneck machine