Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times
From MaRDI portal
Publication:958443
DOI10.1016/j.cor.2007.12.010zbMath1162.90461OpenAlexW2064243977MaRDI QIDQ958443
Zne-Jung Lee, Kuo-Ching Ying, Shih-Wei Lin
Publication date: 4 December 2008
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2007.12.010
schedulingsimulated annealingtabu searchgenetic algorithmnon-permutation flowline manufacturing cell
Related Items (7)
The third comprehensive survey on scheduling problems with setup times/costs ⋮ Effect of solution representations on tabu search in scheduling applications ⋮ A comprehensive review of flowshop group scheduling literature ⋮ A hybrid flowshop scheduling problem for a cold treating process in seamless steel tube production ⋮ Flow shop batching and scheduling with sequence-dependent setup times ⋮ Hybrid flowshop scheduling with machine and resource-dependent processing times ⋮ A branch and bound enhanced genetic algorithm for scheduling a flowline manufacturing cell with sequence dependent family setup times
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Optimization by Simulated Annealing
- Single machine group scheduling with resource dependent setup and processing times
- Single facility multi-class job scheduling
- A mixed integer program for loading and scheduling multiple flexible manufacturing cells
- A comparison of scheduling philosophies for manufacturing cells
- Two-machine flowshop group scheduling problem
- Scheduling a flowline manufacturing cell with sequence dependent family setup times
- A very fast tabu search algorithm for the permutation flow shop problem with makespan criterion
- Heuristics for operator scheduling in group technology cells
- Group scheduling on two cells with intercell movement
- Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups
- Forming part families by using genetic algorithm and designing machine cells under demand changes
- Tabu Search—Part I
- Tabu Search—Part II
- An evaluation of group scheduling heuristics in a flow-line manufacturing cell
- Jointly solving the group scheduling and machining speed selection problems: A hybrid tabu search and simulated annealing approach
- Minimizing flow time in a flow-line manufacturing cell with family setup times
- Equation of State Calculations by Fast Computing Machines
This page was built for publication: Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times