Minimizing weighted tardiness of job-shop scheduling using a hybrid genetic algorithm

From MaRDI portal
Publication:958545

DOI10.1016/j.ejor.2007.10.063zbMath1163.90004OpenAlexW1994806929MaRDI QIDQ958545

Waiman Cheung, Lawrence C. Leung, Hong Zhou

Publication date: 5 December 2008

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2007.10.063




Related Items (17)

RETRACTED ARTICLE: Approach towards problem solving on single machine scheduling with unequal release dates and learning effectMinimization of the total weighted tardiness on a single machine scheduling problem with a position based learning effect and unequal release datesConfiguration and the advantages of the shifting bottleneck procedure for optimizing the job shop total weighted tardiness scheduling problemShifting bottleneck scheduling for total weighted tardiness minimization -- a computational evaluation of subproblem and re-optimization heuristicsHeuristic approaches for scheduling jobs in large-scale flexible job shopsA simulated annealing algorithm based on block properties for the job shop scheduling problem with total weighted tardiness objectiveDispatching problems for parallel machines in the TFT‐LCD assembly processA hybrid differential evolution and tree search algorithm for the job shop scheduling problemA PMBGA to optimize the selection of rules for job shop scheduling based on the Giffler-Thompson algorithmA general approach for optimizing regular criteria in the job-shop scheduling problemAutomatically evolving preference-based dispatching rules for multi-objective job shop schedulingA poly-hybrid PSO optimization method with intelligent parameter adjustmentA local and global search combine particle swarm optimization algorithm for job-shop scheduling to minimize makespanBi-criteria assembly line balancing by considering flexible operation timesMulti-parallel work centers scheduling optimization with shared or dedicated resources in low-volume low-variety production systemsA meta-heuristic to solve the just-in-time job-shop scheduling problemA tabu search algorithm to minimize total weighted tardiness for the job shop scheduling problem



Cites Work




This page was built for publication: Minimizing weighted tardiness of job-shop scheduling using a hybrid genetic algorithm