Aggregated scheduling of a multiproduct batch plant by two-stage stochastic integer programming
From MaRDI portal
Publication:959490
DOI10.1023/B:OPTE.0000038890.51798.5azbMath1151.90443MaRDI QIDQ959490
Rüdiger Schultz, Guido Sand, Sebastian Engell, Andreas Märkert
Publication date: 11 December 2008
Published in: Optimization and Engineering (Search for Journal in Brave)
schedulingpolymerizationdecomposition methodsmultiproduct batch processingstochastic integer programming with recourse
Integer programming (90C10) Stochastic programming (90C15) Stochastic scheduling theory in operations research (90B36)
Related Items (5)
An exact algorithm for solving large-scale two-stage stochastic mixed-integer problems: some theoretical and experimental aspects ⋮ Continuity and stability of fully random two-stage stochastic programs with mixed-integer recourse ⋮ Challenges in Enterprise Wide Optimization for the Process Industries ⋮ Studying the interdependence of contractual and operational flexibilities in the market of specialty chemicals ⋮ Conditional value-at-risk in stochastic programs with mixed-integer recourse
Uses Software
This page was built for publication: Aggregated scheduling of a multiproduct batch plant by two-stage stochastic integer programming