Single-pass and approximate dynamic-programming algorithms for order acceptance and capacity planning
From MaRDI portal
Publication:964848
DOI10.1007/s10732-008-9096-9zbMath1190.90259OpenAlexW2157368965MaRDI QIDQ964848
Roel Leus, Jade Herbots, Willy S. Herroelen
Publication date: 21 April 2010
Published in: Journal of Heuristics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10732-008-9096-9
Applications of mathematical programming (90C90) Approximation methods and heuristics in mathematical programming (90C59) Dynamic programming (90C39)
Related Items (1)
Cites Work
- Looking ahead with the pilot method
- Project network models with discounted cash flows a guided tour through recent developments
- Finite-capacity scheduling-based planning for revenue-based capacity management
- Project scheduling. A research handbook.
- Workload based order acceptance in job shop environments
- Rollout algorithms for stochastic scheduling problems
- A branch-and-cut algorithm for scheduling of projects with variable-intensity activities
- Dynamic Portfolio Selection of NPD Programs Using Marginal Returns
- Dynamic order acceptance and capacity planning on a single bottleneck resource
- Unnamed Item
- Unnamed Item
This page was built for publication: Single-pass and approximate dynamic-programming algorithms for order acceptance and capacity planning