On maximizing the profit of a satellite launcher: selecting and scheduling tasks with time windows and setups
From MaRDI portal
Publication:967435
DOI10.1016/j.dam.2009.02.018zbMath1185.90087OpenAlexW2030638570MaRDI QIDQ967435
J. Meng-Gérard, Francis Sourd, Philippe Chrétienne, Philippe Baptiste
Publication date: 28 April 2010
Published in: Discrete Applied Mathematics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.dam.2009.02.018
Related Items (1)
Cites Work
- Unnamed Item
- Minimizing the number of late jobs in a stochastic setting using a chance constraint
- Mutual exclusion scheduling with interval graphs or related classes. I
- Preemptive scheduling with rejection
- Scheduling a single machine to minimize a regular objective function under setup constraints
- Ten notes on equal-processing-time scheduling: at the frontiers of solvability in polynomial time
- Scheduling with machine cost and rejection
- Batch processing with interval graph compatibilities between tasks
- Techniques for scheduling with rejection
- Multiprocessor Scheduling with Rejection
- Preemptive multiprocessor scheduling with rejection
This page was built for publication: On maximizing the profit of a satellite launcher: selecting and scheduling tasks with time windows and setups