Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance

From MaRDI portal
Publication:967809

DOI10.1016/j.apm.2009.04.014zbMath1185.90084OpenAlexW2026949381MaRDI QIDQ967809

Chou-Jung Hsu, Chwen-Tzeng Su, Chinyao Low, Min Ji

Publication date: 2 May 2010

Published in: Applied Mathematical Modelling (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.apm.2009.04.014




Related Items (22)

Order acceptance and due-date quotation in low machine ratesMinimizing the weighted sum of maximum earliness and maximum tardiness costs on a single machine with periodic preventive maintenanceScheduling optimization of a stochastic flexible job-shop system with time-varying machine failure rateNon-resumable scheduling on a single bounded parallel-batch machine with periodic maintenanceMinimizing the makespan on a single machine with flexible maintenances and jobs' release datesPatient scheduling with periodic deteriorating maintenance on single medical deviceA binary multiple knapsack model for single machine scheduling with machine unavailabilityCoordinated optimization of production scheduling and maintenance activities with machine reliability deteriorationA lower bound for minimizing the total completion time of a three-agent scheduling problemMinimizing total completion time on a single machine with a flexible maintenance activitySingle-machine Scheduling Problems with Aging/Deteriorating Effect under an Optional Maintenance Activity ConsiderationMaintenance scheduling problem with fuzzy random time windows on a single machineA novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem: simulation-based optimization approachHeuristic methods for the single-machine scheduling problem with periodical resource constraintsDeveloping a flexible manufacturing control system considering mixed uncertain predictive maintenance model: a simulation-based optimization approachA multi-objective approach to simultaneous determination of spare part numbers and preventive replacement timesSingle machine batch scheduling to minimize the sum of total flow time and batch delivery cost with an unavailability intervalMinimizing total earliness and tardiness for common due date single-machine scheduling with an unavailability intervalSingle-machine common due date total earliness/tardiness scheduling with machine unavailabilityConsidering human error in optimizing production and corrective and preventive maintenance policies for manufacturing systemsSingle machine scheduling with multiple common due date assignment and aging effect under a deteriorating maintenance activity considerationAn FPTAS of minimizing total weighted completion time on single machine with position constraint



Cites Work


This page was built for publication: Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance