A new heuristic for open shop total completion time problem
From MaRDI portal
Publication:967860
DOI10.1016/j.apm.2009.06.014zbMath1185.90096OpenAlexW1989495531MaRDI QIDQ967860
Publication date: 2 May 2010
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2009.06.014
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (3)
A new particle swarm optimization for multi-objective open shop scheduling ⋮ On the asymptotic optimality and improved strategies of SPTB heuristic for open-shop scheduling problem ⋮ Multi-objective open shop scheduling by considering human error and preventive maintenance
Cites Work
- Unnamed Item
- Unnamed Item
- Asymptotic optimality in probability of a heuristic schedule for open shops with job overlaps
- The total completion time open shop scheduling problem with a given sequence of jobs on one machine
- Heuristic constructive algorithms for open shop scheduling to minimize mean flow time
- Scheduling the Open Shop to Minimize Mean Flow Time
- Open shop problems with unit time operations
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
This page was built for publication: A new heuristic for open shop total completion time problem