Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

A faster algorithm for a due date assignment problem with tardy jobs

From MaRDI portal
Publication:969519
Jump to:navigation, search

DOI10.1016/j.orl.2009.10.013zbMath1185.90135OpenAlexW2012701387MaRDI QIDQ969519

Christos P. Koulamas

Publication date: 7 May 2010

Published in: Operations Research Letters (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.orl.2009.10.013


zbMATH Keywords

due date assignmentweighted number of tardy jobssingle-machine sequencing


Mathematics Subject Classification ID

Discrete location and assignment (90B80)


Related Items (6)

Bicriteria scheduling for due date assignment with total weighted tardiness ⋮ A survey on offline scheduling with rejection ⋮ Due-window assignment problems with unit-time jobs ⋮ Four single-machine scheduling problems involving due date determination decisions ⋮ Proportionate flow shop: New complexity results and models with due date assignment ⋮ A classification of dynamic programming formulations for offline deterministic single-machine scheduling problems



Cites Work

  • Two due date assignment problems in scheduling a single machine


This page was built for publication: A faster algorithm for a due date assignment problem with tardy jobs

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:969519&oldid=12955600"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 30 January 2024, at 19:36.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki