Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

A projective algorithm for preemptive open shop scheduling with two multiprocessor groups

From MaRDI portal
Publication:969520
Jump to:navigation, search

DOI10.1016/j.orl.2009.10.007zbMath1185.90081OpenAlexW2057623859MaRDI QIDQ969520

Tamás Kis, Dominique de Werra, Wiesław X. Kubiak

Publication date: 7 May 2010

Published in: Operations Research Letters (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.orl.2009.10.007

zbMATH Keywords

linear programmingmultiprocessor operationspreemptive open shop scheduling


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35)


Related Items

On a conjecture for the university timetabling problem, A hybrid imperialist competitive algorithm for minimizing makespan in a multi-processor open shop, Multi-objective open shop scheduling by considering human error and preventive maintenance



Cites Work

  • Preemptive open shop scheduling with multiprocessors: Polynomial cases and applications
  • Scheduling open shops with parallel machines
  • Scheduling multiprocessor tasks -- An overview
  • Complexity of some special types of timetabling problems
  • A generalized class-teacher model for some timetabling problems
  • Open Shop Scheduling to Minimize Finish Time
Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:969520&oldid=12959402"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 30 January 2024, at 20:44.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki