A two-stage hybrid flowshop with uniform machines and setup times
From MaRDI portal
Publication:969780
DOI10.1016/S0895-7177(97)00258-6zbMath1185.90078OpenAlexW1973996354MaRDI QIDQ969780
Publication date: 8 May 2010
Published in: Mathematical and Computer Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0895-7177(97)00258-6
Related Items
Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates, Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective, A comprehensive review of flowshop group scheduling literature, A two-stage hybrid flowshop scheduling problem with a function constraint and unrelated alternative machines, A survey of scheduling problems with setup times or costs, Heuristics for periodical batch job scheduling in a MapReduce computing framework, Minimizing makespan in a two-stage hybrid flow shop scheduling problem with open shop in one stage, The hybrid flow shop scheduling problem
Cites Work
- Branch and bound algorithm for the flow shop with multiple processors
- A hybrid two-stage flowshop with part family, batch production, major and minor set-ups
- Scheduling a two-stage hybrid flowshop with separable setup and removal times
- Two-Stage, Hybrid Flowshop Scheduling Problem
- Analysis of Classes of Heuristics for Scheduling a Two-Stage Flow Shop with Parallel Machines at One Stage
- Unnamed Item
- Unnamed Item