Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown

From MaRDI portal
Publication:980290

DOI10.1016/j.camwa.2009.10.001zbMath1189.90052OpenAlexW2045325438MaRDI QIDQ980290

Yuan-Shyi Peter Chiu, Mei-Fang Wu, Kuang-Ku Chen, Feng-Tsung Cheng

Publication date: 28 June 2010

Published in: Computers \& Mathematics with Applications (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.camwa.2009.10.001



Related Items

Remarks on the optimization method of a manufacturing system with stochastic breakdown and rework process in supply chain management, On the convexity for the expected total cost per unit time of the EPQ model with scrap, rework and stochastic machine breakdown, Advertisement Policy, Reliability Dependent Imperfect Production and Environmental Pollution Control Problem in Fuzzy-Rough Environment, Solving production lot size problem with an improved delivery policy and failure in rework by a simplifi ed solution procedure, Stochastic machine breakdown and discrete delivery in an imperfect inventory-production system, Analysis of a discrete production workstation, Unnamed Item, An economic production quantity model with random yield subject to process compressibility, Optimal production run in an imperfect production process with maintenance under warranty and product insurance, Modeling an inventory problem with random supply, inspection and machine breakdown, A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering, Pricing and production decisions in multi-product single machine manufacturing system with discrete delivery and rework, Revisiting revenue management for remanufactured products, Notes on the mathematical modeling approach used to determine the replenishment policy for the EMQ model with rework and multiple shipments, A two-phase approach for jointly determining the lot size and delivery policy in a vendor-buyer integrated system with rework, Optimization of inventory system with defects, rework failure and two types of errors under crisp and fuzzy approach, Imperfect production process with learning and forgetting effects



Cites Work