Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown
From MaRDI portal
Publication:980290
DOI10.1016/j.camwa.2009.10.001zbMath1189.90052OpenAlexW2045325438MaRDI QIDQ980290
Yuan-Shyi Peter Chiu, Mei-Fang Wu, Kuang-Ku Chen, Feng-Tsung Cheng
Publication date: 28 June 2010
Published in: Computers \& Mathematics with Applications (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.camwa.2009.10.001
production planningbreakdownreworkoperations managementfinite production rate modelreplenishment run time
Related Items
Remarks on the optimization method of a manufacturing system with stochastic breakdown and rework process in supply chain management, On the convexity for the expected total cost per unit time of the EPQ model with scrap, rework and stochastic machine breakdown, Advertisement Policy, Reliability Dependent Imperfect Production and Environmental Pollution Control Problem in Fuzzy-Rough Environment, Solving production lot size problem with an improved delivery policy and failure in rework by a simplifi ed solution procedure, Stochastic machine breakdown and discrete delivery in an imperfect inventory-production system, Analysis of a discrete production workstation, Unnamed Item, An economic production quantity model with random yield subject to process compressibility, Optimal production run in an imperfect production process with maintenance under warranty and product insurance, Modeling an inventory problem with random supply, inspection and machine breakdown, A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering, Pricing and production decisions in multi-product single machine manufacturing system with discrete delivery and rework, Revisiting revenue management for remanufactured products, Notes on the mathematical modeling approach used to determine the replenishment policy for the EMQ model with rework and multiple shipments, A two-phase approach for jointly determining the lot size and delivery policy in a vendor-buyer integrated system with rework, Optimization of inventory system with defects, rework failure and two types of errors under crisp and fuzzy approach, Imperfect production process with learning and forgetting effects
Cites Work
- Unnamed Item
- A joint economic-lot-size model for purchaser and vendor in fuzzy sense
- Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
- An economic production lot size model with deteriorating items, stock-dependent demand, inflation, and partial backlogging
- A dynamic lot sizing model with exponential machine breakdowns
- Analysis of a production-inventory system with machine breakdowns and shutdowns
- Approximations to production lot sizing with machine breakdowns.
- Lot size-reorder point inventory model with fuzzy demands
- Heuristic genetic algorithms for general capacitated lot-sizing problems
- Effects of random defective rate and imperfect rework process on economic production quantity model
- A note on optimal replenishment policy for imperfect quality EMQ model with rework and backlogging
- An EMQ model with inspections and random machine failures
- Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System
- Production Lot Sizing with Machine Breakdowns
- Inventory management under random supply disruptions and partial backorders
- Note: The economic manufacturing lot-sizing problem with imperfect production processes: Bounds and optimal solutions
- Production-Inventory Systems with Unreliable Machines
- Joint determination of preventive maintenance and safety stocks in an unreliable production environment
- Analysis of a Production/Inventory System Subject to Random Disruptions
- Joint determination of production quantity, inspection schedule, and quality control for an imperfect process with deteriorating products