Approximation algorithms for multi-agent scheduling to minimize total weighted completion time

From MaRDI portal
Publication:989525

DOI10.1016/J.IPL.2009.04.018zbMath1205.68516OpenAlexW2091376812MaRDI QIDQ989525

Kangbok Lee, Byung-Cheon Choi, Joseph Y.-T. Leung, Michael L. Pinedo

Publication date: 20 August 2010

Published in: Information Processing Letters (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ipl.2009.04.018




Related Items (42)

A new approximation algorithm for multi-agent scheduling to minimize makespan on two machinesFast approximation algorithms for bi-criteria scheduling with machine assignment costsProportionate flow shop scheduling with multi-agents to maximize total gains of JIT jobsMulti-agent scheduling in a no-wait flow shop system to maximize the weighted number of just-in-time jobsSingle machine scheduling with two competing agents and equal job processing timesRouting and scheduling problems with two agents on a line-shaped networkScheduling problems with two competing agents to minimized weighted earliness-tardinessTwo-agent singe-machine scheduling with release times to minimize the total weighted completion timeAn investigation on a two-agent single-machine scheduling problem with unequal release datesScheduling Two-Agents with a Time-Dependent Deterioration to Minimize the Minsum Earliness MeasuresA time-dependent scheduling problem to minimize the sum of the total weighted tardiness among two agentsApproximation schemes for two-machine flow shop scheduling with two agentsTwo-agent single-machine scheduling with release dates to minimize the makespanTwo-Machine and Two-Agent Flow Shop with Special Processing Times StructuresSingle-machine scheduling with multi-agents to minimize total weighted late workSingle machine batch scheduling with two competing agents to minimize total flowtimeA two-agent single-machine scheduling problem to minimize the total cost with release datesA two-agent single-machine scheduling problem with late work criteriaScheduling problems with two agents and a linear non-increasing deterioration to minimize earliness penaltiesScheduling two projects with controllable processing times in a single-machine environmentA note on two-agent scheduling with resource dependent release times on a single machineA single-machine two-agent scheduling problem by a branch-and-bound and three simulated annealing algorithmsScheduling two agents with sum-of-processing-times-based deterioration on a single machineA single-machine bi-criterion scheduling problem with two agentsA just-in-time scheduling problem with two competing agentsTwo-agent single-machine scheduling with assignable due datesTwo-agent single-machine scheduling problem with just-in-time jobsA common framework and taxonomy for multicriteria scheduling problems with interfering and competing jobs: multi-agent scheduling problemsSolving a two-agent single-machine scheduling problem considering learning effectA honey-bees optimization algorithm for a two-agent single-machine scheduling problem with ready timesScheduling problems with two competing agents to minimize minmax and minsum earliness measuresA two-machine flowshop problem with two agentsTwo-agent scheduling on a single machine with release datesA Batch Scheduling Problem with Two AgentsTwo-agent scheduling on unrelated parallel machines with total completion time and weighted number of tardy jobs criteriaTwo approximation algorithms for two-agent scheduling on parallel machines to minimize makespanAn approximation algorithm for multi-agent scheduling on two uniform parallel machinesAn algorithm for multi-agent scheduling to minimize the makespan on \(m\) parallel machinesShared processor schedulingSINGLE MACHINE FAMILY SCHEDULING WITH TWO COMPETING AGENTS TO MINIMIZE MAKESPANAn Ordered Flow Shop with Two AgentsVehicle scheduling problems with two agents on a line




Cites Work




This page was built for publication: Approximation algorithms for multi-agent scheduling to minimize total weighted completion time