Real-time scheduling for twin RMGs in an automated container yard
From MaRDI portal
Publication:989643
DOI10.1007/s00291-010-0209-0zbMath1200.90085OpenAlexW2123874439MaRDI QIDQ989643
Seung Min Ok, Kwang Ryel Ryu, Taejin Park, Ri Choe
Publication date: 23 August 2010
Published in: OR Spectrum (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s00291-010-0209-0
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (5)
Cooperative twin-crane scheduling ⋮ Models and algorithms for a yard crane scheduling problem in container ports ⋮ A generalized classification scheme for crane scheduling with interference ⋮ Storage yard operations in container terminals: literature overview, trends, and research directions ⋮ Yard crane scheduling for container storage, retrieval, and relocation
Cites Work
- Unnamed Item
- Crane scheduling in container yards with inter-crane interference
- Container terminal operation and operations research -- a classification and literature review
- A beam search algorithm for the load sequencing of outbound containers in port container terminals
- Operations research at container terminals: a literature update
- Yard crane scheduling in port container terminals
- An Optimal Routing Algorithm for a Transfer Crane in Port Container Terminals
- Analysis and Algorithms for the Transtainer Routing Problem in Container Port Operations
- Heuristic algorithms for routing yard-side equipment for minimizing loading times in container terminals
This page was built for publication: Real-time scheduling for twin RMGs in an automated container yard