Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms
From MaRDI portal
Publication:990459
DOI10.1016/j.amc.2007.02.109zbMath1193.90110OpenAlexW2059220531MaRDI QIDQ990459
Fereydoon Kianfar, Mohammad R. Ranjbar
Publication date: 1 September 2010
Published in: Applied Mathematics and Computation (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.amc.2007.02.109
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (12)
A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints ⋮ Generating a robust baseline schedule for the robust discrete time/resource trade-off problem under work content uncertainty ⋮ Controllable processing times in project and production management: analysing the trade-off between processing times and the amount of resources ⋮ Project scheduling with finite or infinite number of activity processing modes -- a survey ⋮ Optimal workforce assignment to operations of a paced assembly line ⋮ Revenue sharing for resource transfer among projects ⋮ A survey of variants and extensions of the resource-constrained project scheduling problem ⋮ A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling ⋮ Railway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environment ⋮ On the choice of baseline schedules for the discrete time/resource trade-off problem under stochastic environment ⋮ A decomposed branch-and-price procedure for integrating demand planning in personnel staffing problems ⋮ A priority-rule method for project scheduling with work-content constraints
Cites Work
- Unnamed Item
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- Resource-constrained project scheduling: A critical activity reordering heuristic
- A hybrid scatter search/electromagnetism meta-heuristic for project scheduling
- Local search methods for the discrete time/resource trade-off problem in project networks
This page was built for publication: Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms