Complexity of single machine scheduling subject to nonnegative inventory constraints

From MaRDI portal
Publication:992655

DOI10.1016/j.ejor.2010.05.036zbMath1205.90115OpenAlexW2163288566MaRDI QIDQ992655

Dirk Briskorn, Byung-Cheon Choi, Kangbok Lee, Joseph Y.-T. Leung, Michael L. Pinedo

Publication date: 9 September 2010

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2010.05.036




Related Items (20)

Relocation scheduling subject to fixed processing sequencesSynchronization in cross-docking networks: a research classification and frameworkSingle machine scheduling with two competing agents and equal job processing timesMinimising total tardiness for a single machine scheduling problem with family setups and resource constraintsOn the integration of diverging material flows into resource-constrained project schedulingMinimizing makespan on a single machine with release dates and inventory constraintsExact algorithms for inventory constrained scheduling on a single machineApproximation schemes for single machine scheduling with non-renewable resource constraintsInterweaving real-time jobs with energy harvesting to maximize throughputApproximation schemes for parallel machine scheduling with non-renewable resourcesTruck scheduling in cross-docking terminals with fixed outbound departuresApproximation algorithms for inventory constrained scheduling on a single machineScheduling of inventory releasing jobs to satisfy time-varying demand: an analysis of complexityScheduling of inventory releasing jobs to minimize a regular objective function of delivery timesReductions between scheduling problems with non-renewable resources and knapsack problemsApproximability of total weighted completion time with resource consuming jobsEffective IG heuristics for a single-machine scheduling problem with family setups and resource constraintsOptimizing consolidation processes in hubs: the hub-arrival-departure problemAn FPTAS of minimizing total weighted completion time on single machine with position constraintApproximability of scheduling problems with resource consuming jobs



Cites Work


This page was built for publication: Complexity of single machine scheduling subject to nonnegative inventory constraints