Finite horizon planning with fixed-interval deliveries and no shortage
From MaRDI portal
Publication:998721
DOI10.1007/BF03398786zbMath1153.90319OpenAlexW2775423254MaRDI QIDQ998721
Bhaba R. Sarker, Ahmad Diponegoro
Publication date: 9 February 2009
Published in: Opsearch (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/bf03398786
Transportation, logistics and supply chain management (90B06) Inventory, storage, reservoirs (90B05)
Related Items (1)
Cites Work
- Unnamed Item
- A one-vendor multi-buyer integrated inventory model
- Optimal batch size and raw material ordering policy for a production system with a fixed-interval, lumpy demand delivery system
- Stochastic inventory problem with piecewise quadratic holding cost function containing a cost-free interval
- A one-vendor multi-buyer integrated inventory model: A comment
- Optimal material control in an assembly system with component commonality
- Lot Sizing in General Assembly Systems with Setup Costs, Setup Times, and Multiple Constrained Resources
- Managing Inventory and Supply Performance in Assembly Systems with Random Supply Capacity and Demand
- A heuristic algorithm for a production planning problem in an assembly system
- A Fully Polynomial Approximation Scheme for Single-Product Scheduling in a Finite Capacity Facility
- Simple Solution Procedures for a Class of Two-Echelon Inventory Problems
- Economic analysis of inventory systems
- Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction
- Computational Complexity of the Capacitated Lot Size Problem
- Two-Interval Inventory-Allocation Policies in a One-Warehouse N-Identical-Retailer Distribution System
- Computational study of the multiechelon production planning problem
- Joint Vendor-buyer Policy in JIT Manufacturing
- Lot Sizing in Serial Assembly Systems with Multiple Constrained Resources
- Efficient, Effective Lot Sizing for Multistage Production Systems
This page was built for publication: Finite horizon planning with fixed-interval deliveries and no shortage