Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
The benchmark instances of the FJSP-F (MATLAB version) - MaRDI portal

Deprecated: Use of MediaWiki\Skin\SkinTemplate::injectLegacyMenusIntoPersonalTools was deprecated in Please make sure Skin option menus contains `user-menu` (and possibly `notifications`, `user-interface-preferences`, `user-page`) 1.46. [Called from MediaWiki\Skin\SkinTemplate::getPortletsTemplateData in /var/www/html/w/includes/Skin/SkinTemplate.php at line 691] in /var/www/html/w/includes/Debug/MWDebug.php on line 372

Deprecated: Use of QuickTemplate::(get/html/text/haveData) with parameter `personal_urls` was deprecated in MediaWiki Use content_navigation instead. [Called from MediaWiki\Skin\QuickTemplate::get in /var/www/html/w/includes/Skin/QuickTemplate.php at line 131] in /var/www/html/w/includes/Debug/MWDebug.php on line 372

The benchmark instances of the FJSP-F (MATLAB version)

From MaRDI portal



DOI10.5281/zenodo.11526695Zenodo11526695MaRDI QIDQ6695994

Dataset published at Zenodo repository.

Author name not available (Why is that?)

Publication date: 8 June 2024

Copyright license: No records found.



The flexible job shop scheduling problem considering the on-site machining fixtures (FJSP-F) benchmark test suite is provided in this file [1]. The LLG-F includes 20 instances (LLG-F1 to LLG-F20) with various scales ranging from three jobs, four machines, and two fixtures to 20 jobs, ten machines, and 12 fixtures. ------------------------------------------------------ The meaning of the main variables:1. dt: The delivery time of each job2. Jm: The eligible machine set of each operation.3. JmNumber: The total number of the machines4. Jf: The eligible fixture set of each operation.5. pjob: The priority of each job.6. rt: The release time of each job.7. T: The processing time of each operation.8. fixnumbegin: The number of Type I fixtures of each fixture (The number of each fixture in inventory)9. fixnumend: The sum of the number of Type I fixtures and Type II fixtures of each fixture (The number of each fixture after the production)10. fixtype1: Categories of Type I fixtures11. fixtype2: Categories of Type II fixtures12. fixtype1seq: Sequences of Type I fixtures13. fixtypewseq: Sequences of Type I fixtures [1] J. Li, X. Li, L. Gao, and Q. Liu, A Flexible Job Shop Scheduling Problem Considering On-Site Machining Fixtures: A Case Study From Customized Manufacturing Enterprise,IEEE Transactions on Automation Science and Engineering, pp. 112, 2024, doi: 10.1109/tase.2024.3485810.






This page was built for dataset: The benchmark instances of the FJSP-F (MATLAB version)