The following pages link to PSPLIB (Q13492):
Displaying 50 items.
- An efficient particle swarm optimizer with application to man-day project scheduling problems (Q1718586) (← links)
- A new approach to determine the critical path in stochastic activity network (Q1718645) (← links)
- Robust proactive project scheduling model for the stochastic discrete time/cost trade-off problem (Q1723411) (← links)
- Important classes of reactions for the proactive and reactive resource-constrained project scheduling problem (Q1730711) (← links)
- The preemptive stochastic resource-constrained project scheduling problem (Q1735185) (← links)
- Designing a framework to improve time series data of construction projects: application of a simulation model and singular spectrum analysis (Q1736812) (← links)
- A study of the Bienstock-Zuckerberg algorithm: applications in mining and resource constrained project scheduling (Q1744895) (← links)
- Towards merging binary integer programming techniques with genetic algorithms (Q1748518) (← links)
- Optimizing version release dates of research and development long-term processes (Q1751861) (← links)
- An effective heuristic for project scheduling with resource availability cost (Q1752859) (← links)
- Generic negotiation mechanisms with side payments -- design, analysis and application for decentralized resource-constrained multi-project scheduling problems (Q1753651) (← links)
- A hybrid metaheuristic for resource-constrained project scheduling with flexible resource profiles (Q1754041) (← links)
- Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems (Q1754108) (← links)
- Optimal project duration for resource leveling (Q1754113) (← links)
- An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem (Q1762055) (← links)
- Enhanced energetic reasoning-based lower bounds for the resource constrained project scheduling problem (Q1762094) (← links)
- An integer programming formulation for the project scheduling problem with irregular time-cost tradeoffs (Q1762128) (← links)
- Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models (Q1767683) (← links)
- On the generation of circuits and minimal forbidden sets (Q1769072) (← links)
- Project scheduling under uncertainty: survey and research potentials (Q1772834) (← links)
- Justification and RCPSP: a technique that pays (Q1772841) (← links)
- Resource-constrained project scheduling: Notation, classification, models, and methods (Q1806880) (← links)
- Computing lower bounds by destructive improvement: An application to resource-constrained project scheduling (Q1806914) (← links)
- Tight LP bounds for resource constrained project scheduling (Q1880319) (← links)
- An efficient time-windowing procedure for scheduling projects under multiple resource constraints (Q1881629) (← links)
- Mixed-integer linear programming for resource leveling problems (Q1926816) (← links)
- A modified PSO algorithm for minimizing the total costs of resources in MRCPSP (Q1954712) (← links)
- The CLWS heuristic for single machine scheduling problem (Q1969836) (← links)
- Using metaheuristics in multiobjective resource constrained project scheduling (Q1969837) (← links)
- Planning horizons based proactive rescheduling for stochastic resource-constrained project scheduling problems (Q1991259) (← links)
- Integrated scheduling and batch ordering for construction project (Q1991384) (← links)
- Mode-based versus activity-based search for a nonredundant resolution of the multimode resource-constrained project scheduling problem (Q1992769) (← links)
- Improved selection in evolutionary multi-objective optimization of multi-skill resource-constrained project scheduling problem (Q2005520) (← links)
- Revenue sharing for resource transfer among projects (Q2027026) (← links)
- Using schedule risk analysis with resource constraints for project control (Q2028756) (← links)
- A distributionally robust analysis of the program evaluation and review technique (Q2030655) (← links)
- A robust optimization approach for the multi-mode resource-constrained project scheduling problem (Q2030698) (← links)
- A fuzzy robustness measure for the scheduling of commissioned product development projects (Q2036560) (← links)
- Two-bar charts packing problem (Q2047190) (← links)
- An efficient genetic algorithm for decentralized multi-project scheduling with resource transfers (Q2076410) (← links)
- A tree search heuristic for the resource constrained project scheduling problem with transfer times (Q2079399) (← links)
- A faster exact method for solving the robust multi-mode resource-constrained project scheduling problem (Q2084041) (← links)
- Improved formulations and new valid inequalities for a hybrid flow shop problem with time-varying resources and chaining time-lag (Q2108105) (← links)
- A computational study of constraint programming approaches for resource-constrained project scheduling with autonomous learning effects (Q2117197) (← links)
- A partition-based branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints (Q2152012) (← links)
- On the integration of diverging material flows into resource-constrained project scheduling (Q2160494) (← links)
- A polyhedral study of event-based models for the resource-constrained project scheduling problem (Q2173056) (← links)
- Optimizing temporary work and overtime in the time cost quality trade-off problem (Q2178101) (← links)
- Using the generalized maximum covering location model to control a project's progress (Q2183555) (← links)
- A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints (Q2197158) (← links)