Pages that link to "Item:Q1278481"
From MaRDI portal
The following pages link to PSPLIB -- a project scheduling problem library (Q1278481):
Displaying 50 items.
- Experimental investigation of heuristics for resource-constrained project scheduling: an update (Q858327) (← links)
- A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty (Q872245) (← links)
- Robust optimization models for project scheduling with resource availability cost (Q880580) (← links)
- Linear programming based algorithms for preemptive and non-preemptive RCPSP (Q884023) (← links)
- A constraint programming approach for the resource-constrained project scheduling problem (Q940840) (← links)
- On the latest starting times and criticality of activities in a network with imprecise durations (Q988966) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- Evaluating project completion time in project networks with discrete random activity durations (Q1017440) (← links)
- A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem (Q1037664) (← links)
- Simulated annealing and tabu search for multi-mode project payment scheduling (Q1042041) (← links)
- A priority-rule method for project scheduling with work-content constraints (Q1046055) (← links)
- A branch and bound algorithm for the resource-constrained project scheduling problem (Q1296084) (← links)
- Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm (Q1296105) (← links)
- Resource-constrained project scheduling: A critical activity reordering heuristic (Q1399574) (← links)
- Lower bounds for resource-constrained project scheduling problems. (Q1399575) (← links)
- On linear lower bounds for the resource constrained project scheduling problem. (Q1399576) (← links)
- Resource-constrained project scheduling: A survey of recent developments. (Q1406618) (← links)
- A fuzzy robust scheduling approach for product development projects. (Q1410333) (← links)
- Solving the resource-constrained project scheduling problem by a variable neighbourhood search. (Q1427560) (← links)
- ProGen/\(\pi x\) -- An instance generator for resource-constrained project scheduling problems with partially renewable resources and further extensions (Q1578557) (← links)
- A linear programming and constraint propagation-based lower bound for the RCPSP (Q1590041) (← links)
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem (Q1590044) (← links)
- IBM ILOG CP optimizer for scheduling. 20+ years of scheduling with constraints at IBM/ILOG (Q1616392) (← links)
- New strategies for stochastic resource-constrained project scheduling (Q1617288) (← links)
- A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints (Q1628053) (← links)
- Computing project makespan distributions: Markovian PERT networks revisited (Q1634063) (← links)
- A path-relinking algorithm for the multi-mode resource-constrained project scheduling problem (Q1651597) (← links)
- Variable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gap (Q1652132) (← links)
- An exact composite lower bound strategy for the resource-constrained project scheduling problem (Q1652587) (← links)
- A computational study of exact approaches for the adjustable robust resource-constrained project scheduling problem (Q1654362) (← links)
- A branch and bound algorithm for project scheduling problem with spatial resource constraints (Q1666182) (← links)
- Redundant cumulative constraints to compute preemptive bounds (Q1686060) (← links)
- Lower bounds for the event scheduling problem with consumption and production of resources (Q1686062) (← links)
- Optimal workforce assignment to operations of a paced assembly line (Q1694335) (← links)
- An efficient pseudo-polynomial algorithm for finding a lower bound on the makespan for the resource constrained project scheduling problem (Q1711441) (← links)
- An efficient particle swarm optimizer with application to man-day project scheduling problems (Q1718586) (← links)
- A new approach to determine the critical path in stochastic activity network (Q1718645) (← links)
- Robust proactive project scheduling model for the stochastic discrete time/cost trade-off problem (Q1723411) (← links)
- Important classes of reactions for the proactive and reactive resource-constrained project scheduling problem (Q1730711) (← links)
- The preemptive stochastic resource-constrained project scheduling problem (Q1735185) (← links)
- Designing a framework to improve time series data of construction projects: application of a simulation model and singular spectrum analysis (Q1736812) (← links)
- A study of the Bienstock-Zuckerberg algorithm: applications in mining and resource constrained project scheduling (Q1744895) (← links)
- Resource tardiness weighted cost minimization in project scheduling (Q1748510) (← links)
- Towards merging binary integer programming techniques with genetic algorithms (Q1748518) (← links)
- Optimizing version release dates of research and development long-term processes (Q1751861) (← links)
- An effective heuristic for project scheduling with resource availability cost (Q1752859) (← links)
- Generic negotiation mechanisms with side payments -- design, analysis and application for decentralized resource-constrained multi-project scheduling problems (Q1753651) (← links)
- A hybrid metaheuristic for resource-constrained project scheduling with flexible resource profiles (Q1754041) (← links)
- Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems (Q1754108) (← links)
- An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem (Q1762055) (← links)