Pages that link to "Item:Q1097161"
From MaRDI portal
The following pages link to Optimal total-work-content-power due-date determination and sequencing (Q1097161):
Displaying 7 items.
- A simpler and faster algorithm for optimal total-work-content-power due data determination (Q583099) (← links)
- Survey of scheduling research involving due date determination decisions (Q1111925) (← links)
- Some observations and extensions of the optimal TWK-power due-date determination and sequencing problem (Q1117832) (← links)
- Scheduling job classes on uniform machines (Q1761112) (← links)
- Analytical determination of optimal TWK due-dates in a job shop (Q3694969) (← links)
- Optimal TWK-power due-date determination and sequencing (Q4724420) (← links)
- Optimal Assignment of Total-work-content Due-dates and Sequencing in a Single-machine Shop (Q5966559) (← links)