Pages that link to "Item:Q1117832"
From MaRDI portal
The following pages link to Some observations and extensions of the optimal TWK-power due-date determination and sequencing problem (Q1117832):
Displaying 4 items.
- Optimal total-work-content-power due-date determination and sequencing (Q1097161) (← links)
- Optimal assignment of due-dates for preemptive single-machine scheduling (Q1341396) (← links)
- Analytical determination of optimal TWK due-dates in a job shop (Q3694969) (← links)
- Optimal TWK-power due-date determination and sequencing (Q4724420) (← links)