Pages that link to "Item:Q1129910"
From MaRDI portal
The following pages link to Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function (Q1129910):
Displaying 20 items.
- Minimizing makespan for scheduling stochastic job shop with random breakdown (Q388592) (← links)
- Two-machine flowshop scheduling problem with bounded processing times to minimize total completion time (Q980257) (← links)
- On stochastic machine scheduling with general distributional assumptions (Q1291772) (← links)
- Two-machine ordered flowshop scheduling under random breakdowns (Q1341394) (← links)
- Scheduling in stochastic flowshops with independent setup, processing and removal times (Q1366705) (← links)
- An approach to solve the minimum expected makespan flow-shop problem subject to breakdowns (Q1598772) (← links)
- Risk measure of job shop scheduling with random machine breakdowns (Q1654341) (← links)
- Stochastically minimizing total flowtime in flowshops with no waiting space (Q1806645) (← links)
- Stochastic single machine scheduling subject to machines breakdowns with quadratic early-tardy penalties for the preemptive-repeat model (Q2471329) (← links)
- A heuristic approach to minimize expected makespan in open shops subject to stochastic processing times and failures (Q2475628) (← links)
- Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness (Q2563893) (← links)
- Johnson's problem with stochastic processing times and optimal service level (Q2572849) (← links)
- Minimizing makespan on a single machine subject to random breakdowns (Q2583704) (← links)
- Heuristics for the two-machine flowshop scheduling problem to minimise makespan with bounded processing times (Q3163137) (← links)
- Scheduling on \(M\) parallel machines subject to random breakdowns to minimize expected mean flow time (Q4306273) (← links)
- Two-machine flowshop minimum-length scheduling problem with random and bounded processing times (Q4806914) (← links)
- Two-Stage Production Scheduling with Separated Set-up Times and Stochastic Breakdowns (Q4849306) (← links)
- A note on minimizing the expected makespan in flowshops subject to breakdowns (Q4859580) (← links)
- A two-stage robust approach for minimizing the weighted number of tardy jobs with objective uncertainty (Q6103748) (← links)
- Minimizing the makespan for the two-machine flow shop scheduling problem with random breakdown (Q6179225) (← links)