Pages that link to "Item:Q1599352"
From MaRDI portal
The following pages link to Preemptive scheduling with two minimax criteria (Q1599352):
Displaying 12 items.
- Primary-secondary bicriteria scheduling on identical machines to minimize the total completion time of all jobs and the maximum T-time of all machines (Q391787) (← links)
- Preemptive repayment policy for multiple loans (Q763209) (← links)
- Minimizing total completion time for preemptive scheduling with release dates and deadline constraints (Q902745) (← links)
- On the two-phase method for preemptive scheduling (Q1107434) (← links)
- Two-agent scheduling to minimize the maximum cost with position-dependent jobs (Q1723571) (← links)
- Bi-criteria Pareto-scheduling on a single machine with due indices and precedence constraints (Q1751234) (← links)
- On preemptive scheduling: A general setting for the two-phase method (Q1917267) (← links)
- Single-machine hierarchical scheduling with release dates and preemption to minimize the total completion time and a regular criterion (Q2030503) (← links)
- Scheduling with release dates and preemption to minimize multiple max-form objective functions (Q2327626) (← links)
- Two-agent single-machine scheduling with release dates and preemption to minimize the maximum lateness (Q2341390) (← links)
- Multicriteria scheduling (Q2566699) (← links)
- Competitive two-agent scheduling with release dates and preemption on a single machine (Q6116025) (← links)