Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
On the two-phase method for preemptive scheduling - MaRDI portal

On the two-phase method for preemptive scheduling (Q1107434)

From MaRDI portal





scientific article; zbMATH DE number 4064758
Language Label Description Also known as
English
On the two-phase method for preemptive scheduling
scientific article; zbMATH DE number 4064758

    Statements

    On the two-phase method for preemptive scheduling (English)
    0 references
    0 references
    1988
    0 references
    Preemptive scheduling problems on parallel processors may in some cases be solved by a two-phase method: first solve an LP problem which will give the minimum total completion time T and the processing times of the jobs on the various processors; second construct a feasible schedule using T time units. Some extensions of this procedure are discussed. A general model for preemptive scheduling is described with a two-phase method for solving problems of this type.
    0 references
    total unimodularity
    0 references
    flexible manufacturing systems
    0 references
    Preemptive scheduling
    0 references
    parallel processors
    0 references
    two-phase method
    0 references
    minimum total completion time
    0 references

    Identifiers

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references