Pages that link to "Item:Q1651647"
From MaRDI portal
The following pages link to Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machines (Q1651647):
Displaying 4 items.
- Two-stage proportionate flexible flow shop to minimize the makespan (Q1945694) (← links)
- A comparison of priority rules for minimizing the maximum lateness in tree data gathering networks (Q6048111) (← links)
- Effective upper and lower bounds for a two-stage reentrant flexible flow shop scheduling problem (Q6164382) (← links)
- Scheduling a two stage proportionate flexible flow shop with dedicated machines and no buffers (Q6606700) (← links)