Pages that link to "Item:Q1754041"
From MaRDI portal
The following pages link to A hybrid metaheuristic for resource-constrained project scheduling with flexible resource profiles (Q1754041):
Displaying 10 items.
- MIP models for resource-constrained project scheduling with flexible resource profiles (Q297247) (← links)
- Scheduling resource-constrained projects with a flexible project structure (Q319777) (← links)
- Project scheduling with flexible resources: formulation and inequalities (Q443821) (← links)
- Resource-constrained project scheduling with flexible resource profiles in continuous time (Q1652311) (← links)
- Multi-parallel work centers scheduling optimization with shared or dedicated resources in low-volume low-variety production systems (Q1988965) (← links)
- An updated survey of variants and extensions of the resource-constrained project scheduling problem (Q2242185) (← links)
- Model and algorithm for human resource-constrained R\&D program scheduling optimization (Q2296461) (← links)
- A metaheuristic solution approach for the time-constrained project scheduling problem (Q2362168) (← links)
- Hybrid algorithm for project scheduling with capacity constraint (Q3613847) (← links)
- Project scheduling to minimize the makespan under flexible resource profiles and marginal diminishing returns of the resource (Q6065637) (← links)