Pages that link to "Item:Q1936599"
From MaRDI portal
The following pages link to The assembly line balancing and scheduling problem with sequence-dependent setup times: problem extension, model formulation and efficient heuristics (Q1936599):
Displaying 29 items.
- New formulations for the setup assembly line balancing and scheduling problem (Q280181) (← links)
- The type E simple assembly line balancing problem: a mixed integer linear programming formulation (Q342081) (← links)
- On a learning precedence graph concept for the automotive industry (Q439367) (← links)
- Balancing and scheduling of flexible mixed model assembly lines (Q481715) (← links)
- An alternative MILP model for makespan minimization on assembly lines (Q523177) (← links)
- The sequence-dependent assembly line balancing problem (Q991824) (← links)
- Balancing assembly lines with variable parallel workplaces: problem definition and effective solution procedure (Q1042153) (← links)
- Balancing a robotic spot welding manufacturing line: an industrial case study (Q1694852) (← links)
- Scheduling with time-dependent discrepancy times (Q1702735) (← links)
- Combinatorial Benders cuts for assembly line balancing problems with setups (Q1751843) (← links)
- Traveling worker assembly line (re)balancing problem: model, reduction techniques, and real case studies (Q1751911) (← links)
- Assembly line balancing: what happened in the last fifteen years? (Q2140264) (← links)
- Multi-manned assembly line balancing problem with dependent task times: a heuristic based on solving a partition problem with constraints (Q2140318) (← links)
- Scheduling wine bottling operations with multiple lines and sequence-dependent set-up times: robust formulation and a decomposition solution approach (Q2158042) (← links)
- Scheduling jobs with a V-shaped time-dependent processing time (Q2215205) (← links)
- SALSA: combining branch-and-bound with dynamic programming to smoothen workloads in simple assembly line balancing (Q2242373) (← links)
- Multiple-source learning precedence graph concept for the automotive industry (Q2256196) (← links)
- Enhanced multi-hoffmann heuristic for efficiently solving real-world assembly line balancing problems in automotive industry (Q2256345) (← links)
- Metaheuristic algorithms for balancing robotic assembly lines with sequence-dependent robot setup times (Q2307078) (← links)
- Balancing and scheduling tasks in assembly lines with sequence-dependent setup times (Q2467265) (← links)
- A novel constraint programming and simulated annealing for disassembly line balancing problem with and/or precedence and sequence dependent setup times (Q2676318) (← links)
- Simultaneous balancing and scheduling of flexible mixed model assembly lines with sequence-dependent setup times (Q2883551) (← links)
- Solving the Type-2 Assembly Line Balancing with Setups Using Logic-Based Benders Decomposition (Q5084654) (← links)
- Sequence-dependent time- and cost-oriented assembly line balancing problems: a combinatorial Benders’ decomposition approach (Q6048109) (← links)
- Robust counterpart mathematical models for balancing, sequencing, and assignment of robotic U-shaped assembly lines with considering failures and setup times (Q6105933) (← links)
- Mathematical model and a variable neighborhood search algorithm for mixed-model robotic two-sided assembly line balancing problems with sequence-dependent setup times (Q6173783) (← links)
- A review and classification of scheduling objectives in unpaced flow shops for discrete manufacturing (Q6547128) (← links)
- Flexibility in manufacturing system design: a review of recent approaches from operations research (Q6554638) (← links)
- Mixed-model moving assembly line material placement optimization for a shorter time-dependent worker walking time (Q6577341) (← links)