Pages that link to "Item:Q1983744"
From MaRDI portal
The following pages link to A better dominance relation and heuristics for two-machine no-wait flowshops with maximum lateness performance measure (Q1983744):
Displaying 5 items.
- No-wait flowshops with bicriteria of makespan and maximum lateness. (Q1410329) (← links)
- Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness (Q1715728) (← links)
- A note on minimizing maximum lateness in a two-machine no-wait flowshop (Q1879796) (← links)
- A new heuristic and dominance relations for no-wait flowshops with setups (Q5936136) (← links)
- Parameter less hybrid IG-Jaya approach for permutation flow shop scheduling problem (Q6065188) (← links)