Pages that link to "Item:Q1991384"
From MaRDI portal
The following pages link to Integrated scheduling and batch ordering for construction project (Q1991384):
Displaying 11 items.
- Multi-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policies (Q526633) (← links)
- Optimal scheduling of purchasing orders for large projects (Q1308877) (← links)
- Network scheduling techniques for construction project management (Q1374467) (← links)
- Survey of quantitative methods in construction (Q1651605) (← links)
- Research for global coordinating method of large equipment scheduling in construction site (Q1723178) (← links)
- An updated survey of variants and extensions of the resource-constrained project scheduling problem (Q2242185) (← links)
- Machine scheduling in production: a content analysis (Q2294174) (← links)
- Stochastic project scheduling with hierarchical alternatives (Q2295321) (← links)
- Scheduling recurrent construction (Q4651734) (← links)
- (Q5439883) (← links)
- A chance-constrained optimization approach integrating project scheduling and material ordering to manage the uncertain material supply (Q6568413) (← links)