Pages that link to "Item:Q2433488"
From MaRDI portal
The following pages link to A note on makespan minimization in two-stage flexible flow shops with uniform machines (Q2433488):
Displaying 4 items.
- Two-stage proportionate flexible flow shop to minimize the makespan (Q1945694) (← links)
- Minimizing makespan in a two-stage hybrid flow shop scheduling problem with open shop in one stage (Q2248262) (← links)
- The hybrid flow shop scheduling problem (Q2270289) (← links)
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective (Q2379653) (← links)