Pages that link to "Item:Q2468474"
From MaRDI portal
The following pages link to Discrete-continuous project scheduling with discounted cash flows - a tabu search approach (Q2468474):
Displaying 23 items.
- Heuristic approaches to discrete-continuous project scheduling problems to minimize the makespan (Q535306) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- Simulated annealing for financing cost distribution based project payment scheduling from a joint perspective (Q744648) (← links)
- Discrete-continuous project scheduling with discounted cash inflows and various payment models -- a review of recent results (Q744660) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations (Q1025246) (← links)
- A priority rule-based heuristic for resource investment project scheduling problem with discounted cash flows and tardiness penalties (Q1036260) (← links)
- Simulated annealing and tabu search for multi-mode project payment scheduling (Q1042041) (← links)
- A tabu search procedure for the resource constrained project scheduling problem with discounted cash flows (Q1342100) (← links)
- Solving the discrete-continuous project scheduling problem via its discretization (Q1401646) (← links)
- Tabu list management methods for a discrete-continuous scheduling problem (Q1600837) (← links)
- Which fuzzy ranking method is best for maximizing fuzzy net present value? (Q1640504) (← links)
- Variable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gap (Q1652132) (← links)
- A branch and bound algorithm for project scheduling problem with spatial resource constraints (Q1666182) (← links)
- Optimizing version release dates of research and development long-term processes (Q1751861) (← links)
- Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models (Q1767683) (← links)
- Revenue sharing for resource transfer among projects (Q2027026) (← links)
- Metaheuristics for multi-mode capital-constrained project payment scheduling (Q2253378) (← links)
- Comparative Analysis of Some Metaheuristics for Discrete-Continuous Project Scheduling with Activities of Identical Processing Rates (Q3188762) (← links)
- Optimization of a highway project planning using a modified genetic algorithm (Q4981882) (← links)
- Simulated Annealing and Tabu Search for Discrete-Continuous Project Scheduling with Discounted Cash Flows (Q5410240) (← links)
- Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty (Q6113306) (← links)
- Simulated annealing for centralised resource-constrained multiproject scheduling to minimise the maximal cash flow gap under different payment patterns (Q6588469) (← links)