Pages that link to "Item:Q2506355"
From MaRDI portal
The following pages link to A bicriteria scheduling with sequence-dependent setup times (Q2506355):
Displaying 18 items.
- Security based bi-objective flow shop scheduling model and its hybrid genetic algorithm (Q279989) (← links)
- Inventory based bi-objective flow shop scheduling model and its hybrid genetic algorithm (Q474788) (← links)
- General flowshop scheduling problem with the sequence dependent setup times: a heuristic approach (Q497626) (← links)
- Comments on ``A bicriteria \(m\)-machine flowshop scheduling with sequence-dependent setup times'' (Q638896) (← links)
- A bicriteria parallel machine scheduling with a learning effect of setup and removal times (Q840149) (← links)
- A bicriteria flowshop scheduling problem with setup times (Q865584) (← links)
- Mathematical model applied to single-track line scheduling problem in Brazilian railways (Q904294) (← links)
- The time-dependent traveling salesman problem and single machine scheduling problems with sequence dependent setup times (Q955327) (← links)
- A bicriteria \(m\)-machine flowshop scheduling with sequence-dependent setup times (Q967801) (← links)
- Scheduling to minimize the sum of weighted flowtime and weighted tardiness of jobs in a flowshop with sequence-dependent setup times. (Q1399596) (← links)
- Domino sequencing: scheduling with state-based sequence-dependent setup times (Q2294316) (← links)
- Minimizing makespan in a two-machine flowshop scheduling with batching and release time (Q2390059) (← links)
- A multi-objective tabu search for a single-machine scheduling problem with sequence-dependent setup times (Q2432854) (← links)
- A survey of scheduling problems with setup times or costs (Q2467249) (← links)
- Workload simulation and optimisation in multi-criteria hybrid flowshop scheduling: a case study (Q3055316) (← links)
- Sequencing heuristic for bicriteria scheduling in a single machine problem (Q3411893) (← links)
- Sequencing with setup time and order tardiness trade-offs (Q5689648) (← links)
- Bi‐criteria formulation for green scheduling with unrelated parallel machines with sequence‐dependent setup times (Q6070133) (← links)