Scheduling to minimize the sum of weighted flowtime and weighted tardiness of jobs in a flowshop with sequence-dependent setup times. (Q1399596)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Scheduling to minimize the sum of weighted flowtime and weighted tardiness of jobs in a flowshop with sequence-dependent setup times. |
scientific article; zbMATH DE number 1957055
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Scheduling to minimize the sum of weighted flowtime and weighted tardiness of jobs in a flowshop with sequence-dependent setup times. |
scientific article; zbMATH DE number 1957055 |
Statements
Scheduling to minimize the sum of weighted flowtime and weighted tardiness of jobs in a flowshop with sequence-dependent setup times. (English)
0 references
30 July 2003
0 references
Scheduling
0 references
flowshops
0 references
sequence-dependent setup times
0 references
heuristics
0 references
0 references
0 references
0 references
0 references
0 references