Pages that link to "Item:Q2629739"
From MaRDI portal
The following pages link to Two faster algorithms for coordination of production and batch delivery: a note (Q2629739):
Displaying 7 items.
- Integrated production and delivery on parallel batching machines (Q320081) (← links)
- Complexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequence (Q1702665) (← links)
- Just-in-time logistics for far-distant suppliers: scheduling truck departures from an intermediate cross-docking terminal (Q1703454) (← links)
- Batch delivery scheduling with multiple decentralized manufacturers (Q1718128) (← links)
- New results on the coordination of transportation and batching scheduling (Q2290566) (← links)
- Single machine scheduling with assignable due dates to minimize maximum and total late work (Q6167395) (← links)
- Integrated production and transportation scheduling problem under nonlinear cost structures (Q6555171) (← links)