Pages that link to "Item:Q2668705"
From MaRDI portal
The following pages link to A graph-based constraint programming approach for the integrated process planning and scheduling problem (Q2668705):
Displaying 3 items.
- Solving integrated process planning and scheduling problem with constructive meta-heuristics (Q1671703) (← links)
- Type-2 integrated process-planning and scheduling problem: reformulation and solution algorithms (Q2146989) (← links)
- An evolution strategy approach for the distributed permutation flowshop scheduling problem with sequence-dependent setup times (Q2146995) (← links)