Pages that link to "Item:Q3032046"
From MaRDI portal
The following pages link to Computing the probability distribution of project duration in a PERT network (Q3032046):
Displaying 24 items.
- EOR project networks (Q760101) (← links)
- A heuristic for optimizing stochastic activity networks with applications to statistical digital circuit sizing (Q833427) (← links)
- An optimization model for stochastic project networks with cash flows (Q867428) (← links)
- Evaluating project completion time in project networks with discrete random activity durations (Q1017440) (← links)
- A factoring approach for the stochastic shortest path problem (Q1180841) (← links)
- Bounding the distribution of project duration in PERT networks (Q1200756) (← links)
- Computing project makespan distributions: Markovian PERT networks revisited (Q1634063) (← links)
- Analytical and simulation models of generalized stochastic networks (Q1675843) (← links)
- Finding the distribution density of the time taken to fulfill the GERT network on the basis of equivalent simplifying transformations (Q1778844) (← links)
- Resource-constrained project scheduling: Notation, classification, models, and methods (Q1806880) (← links)
- A new structural mechanism for reducibility of stochastic PERT networks (Q1869478) (← links)
- Analysis of the stable laws of distribution of the duration of operations in the stochastic network projects (Q1881991) (← links)
- Stochastic task networks -- trading performance for stability (Q2011606) (← links)
- Proposal of a new distribution in PERT methodology (Q2430618) (← links)
- A new approximation algorithm for obtaining the probability distribution function for project completion time (Q2460585) (← links)
- Mixture densities for project management activity times: A robust approach to PERT (Q2470106) (← links)
- Global optima results for the Kauffman \(NK\) model (Q2490339) (← links)
- Some remarks on the expected delay of project duration in a PERT network (Q3346077) (← links)
- Algorithms to calculate the distribution of the longest path length of a stochastic activity network with continuous activity durations (Q3423883) (← links)
- (Q3740548) (← links)
- Computing bounds on project duration distributions for stochastic PERT networks (Q4526866) (← links)
- The exact overall time distribution of a project with uncertain task durations (Q5928451) (← links)
- Network reliability: Heading out on the highway (Q6087070) (← links)
- Analysis of the impact of corrective actions for stochastic project networks (Q6565390) (← links)