Pages that link to "Item:Q3114652"
From MaRDI portal
The following pages link to A Time-Oriented Branch-and-Bound Algorithm for Resource-Constrained Project Scheduling with Generalised Precedence Constraints (Q3114652):
Displaying 41 items.
- Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming (Q319710) (← links)
- Solving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computation (Q336432) (← links)
- Formulating and solving a multi-mode resource-collaboration and constrained scheduling problem (MRCCSP) (Q363579) (← links)
- A game theoretical approach to sharing penalties and rewards in projects (Q421792) (← links)
- Production scheduling with alternative process plans (Q439374) (← links)
- Time and work generalised precedence relationships in project scheduling with pre-emption: an application to the management of service centres (Q439612) (← links)
- An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations (Q439614) (← links)
- An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags (Q657259) (← links)
- Scheduling and constraint propagation (Q697570) (← links)
- A new lower bound for the resource-constrained project scheduling problem with generalized precedence relations (Q709101) (← links)
- A double genetic algorithm for the MRCPSP/max (Q709102) (← links)
- Algorithms for propagating resource constraints in AI planning and scheduling: Existing approaches and new results (Q814422) (← links)
- Robust optimization models for project scheduling with resource availability cost (Q880580) (← links)
- Strong valid inequalities for the resource-constrained scheduling problem with uniform resource requirements (Q924628) (← links)
- Theoretical aspects of multicriteria flight gate scheduling: Deterministic and fuzzy models (Q983626) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- A branch-and-bound algorithm to solve the equal-execution-time job scheduling problem with precedence constraint and profile (Q1121783) (← links)
- A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations (Q1303751) (← links)
- Lower bounds for resource-constrained project scheduling problems. (Q1399575) (← links)
- A branch-and-bound algorithm for the resource-constrained project scheduling problem (Q1401642) (← links)
- Branch and bound algorithms for resource constrained project scheduling problem subject to nonrenewable resources with prescheduled procurement (Q1718808) (← links)
- New model and heuristics for safety stock placement in general acyclic supply chain networks (Q1762120) (← links)
- Resource-constrained project scheduling: Notation, classification, models, and methods (Q1806880) (← links)
- A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags (Q1869389) (← links)
- A satisfiability and workload-based exact method for the resource constrained project scheduling problem with generalized precedence constraints (Q2029253) (← links)
- A partition-based branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints (Q2152012) (← links)
- A polyhedral study of event-based models for the resource-constrained project scheduling problem (Q2173056) (← links)
- A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints (Q2197158) (← links)
- Considering project management activities for engineering design groups (Q2226486) (← links)
- Flight gate assignment and recovery strategies with stochastic arrival and departure times (Q2362237) (← links)
- A Boolean satisfiability approach to the resource-constrained project scheduling problem (Q2430594) (← links)
- Solving RCPSP/max by lazy clause generation (Q2434317) (← links)
- Project selection, scheduling and resource allocation with time dependent returns (Q2519075) (← links)
- On some implementations of solving the resource constrained project scheduling problems (Q3388406) (← links)
- Disruption management in flight gate scheduling (Q5422016) (← links)
- Scheduling contractors' farm‐to‐farm crop harvesting operations (Q5488239) (← links)
- A constraint-based method for project scheduling with time windows (Q5960034) (← links)
- A constructive branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints (Q6102850) (← links)
- Equitable scheduling on a single machine (Q6103750) (← links)
- A branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer times (Q6109310) (← links)
- A chance-constrained optimization approach integrating project scheduling and material ordering to manage the uncertain material supply (Q6568413) (← links)