An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags (Q657259)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags |
scientific article; zbMATH DE number 5997882
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags |
scientific article; zbMATH DE number 5997882 |
Statements
An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags (English)
0 references
16 January 2012
0 references
resource-constrained project scheduling
0 references
maximum time lags
0 references
meta-heuristic algorithms
0 references
0 references