Pages that link to "Item:Q3194700"
From MaRDI portal
The following pages link to On the two-stage hybrid flow shop with dedicated machines (Q3194700):
Displaying 10 items.
- A note on ``A heuristic method for two-stage hybrid flow shop with dedicated machines'' (Q336500) (← links)
- A two-stage hybrid flow shop with dedicated machines at the first stage (Q336642) (← links)
- Exact resolution of the two-stage hybrid flow shop with dedicated machines (Q479265) (← links)
- Flow-shops with a dominant machine (Q1203800) (← links)
- Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machines (Q1651647) (← links)
- On the optimality conditions of the two-machine flow shop problem (Q1754105) (← links)
- A note on the two-stage hybrid flow shop problem with dedicated machines (Q1926618) (← links)
- Two-stage proportionate flexible flow shop to minimize the makespan (Q1945694) (← links)
- A comparison of priority rules for minimizing the maximum lateness in tree data gathering networks (Q6048111) (← links)
- On the two-stage assembly flow shop problem (Q6592922) (← links)