Pages that link to "Item:Q3369502"
From MaRDI portal
The following pages link to Coordination of set-ups between two stages of a supply chain using multi-objective genetic algorithms (Q3369502):
Displaying 4 items.
- Green scheduling of a two-machine flowshop: trade-off between makespan and energy consumption (Q320777) (← links)
- A genetic algorithm for optimal operating parameters of VMI system in a two-echelon supply chain (Q884073) (← links)
- A modified Pareto genetic algorithm for multi-objective build-to-order supply chain planning with product assembly (Q994251) (← links)
- Bi‐criteria formulation for green scheduling with unrelated parallel machines with sequence‐dependent setup times (Q6070133) (← links)