Green scheduling of a two-machine flowshop: trade-off between makespan and energy consumption (Q320777)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Green scheduling of a two-machine flowshop: trade-off between makespan and energy consumption |
scientific article; zbMATH DE number 6635716
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Green scheduling of a two-machine flowshop: trade-off between makespan and energy consumption |
scientific article; zbMATH DE number 6635716 |
Statements
Green scheduling of a two-machine flowshop: trade-off between makespan and energy consumption (English)
0 references
7 October 2016
0 references
green scheduling
0 references
sustainable manufacturing
0 references
multi-objective optimization
0 references
sequence-dependent setup times
0 references
0 references
0 references
0 references
0 references