Pages that link to "Item:Q337027"
From MaRDI portal
The following pages link to Minimizing the total completion time in a distributed two stage assembly system with setup times (Q337027):
Displaying 10 items.
- Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures (Q1622791) (← links)
- The 2-stage assembly flowshop scheduling problem with total completion time: efficient constructive heuristic and metaheuristic (Q1651546) (← links)
- Differential evolution metaheuristics for distributed limited-buffer flowshop scheduling with makespan criterion (Q2003413) (← links)
- Heuristics for an assembly flow-shop with non-identical assembly machines and sequence dependent setup times to minimize sum of holding and delay costs (Q2257346) (← links)
- Two-stage assembly scheduling problem for minimizing total tardiness with setup times (Q2293429) (← links)
- Scheduling a hybrid assembly-differentiation flowshop to minimize total flow time (Q2629637) (← links)
- Just-in-time scheduling for a distributed concrete precast flow shop system (Q2668621) (← links)
- A hybrid multi-objective approach for real-time flexible production scheduling and rescheduling under dynamic environment in Industry 4.0 context (Q2668716) (← links)
- A learning-based two-stage optimization method for customer order scheduling (Q2669593) (← links)
- Meta-Lamarckian-based iterated greedy for optimizing distributed two-stage assembly flowshops with mixed setups (Q6099438) (← links)