The following pages link to (Q3468865):
Displaying 50 items.
- On the efficient modeling and solution of the multi-mode resource-constrained project scheduling problem with generalized precedence relations (Q280157) (← links)
- Resource levelling in project scheduling with generalized precedence relationships and variable execution intensities (Q280170) (← links)
- A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations (Q309061) (← links)
- Network construction problems with due dates (Q319443) (← links)
- Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming (Q319710) (← links)
- Scatter search with path relinking for the job shop with time lags and setup times (Q337556) (← links)
- Modelling and solving generalised operational surgery scheduling problems (Q342152) (← links)
- The total adjustment cost problem: applications, models, and solution algorithms (Q398909) (← links)
- Time and work generalised precedence relationships in project scheduling with pre-emption: an application to the management of service centres (Q439612) (← links)
- An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations (Q439614) (← links)
- A min-flow algorithm for minimal critical set detection in resource constrained project scheduling (Q456733) (← links)
- New concepts for activity float in resource-constrained project management (Q622136) (← links)
- Dismantling of nuclear power plants at optimal NPV (Q646667) (← links)
- An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags (Q657259) (← links)
- Minimizing makespan for a bipartite graph on a single processor with an integer precedence delay. (Q703281) (← links)
- A new lower bound for the resource-constrained project scheduling problem with generalized precedence relations (Q709101) (← links)
- A double genetic algorithm for the MRCPSP/max (Q709102) (← links)
- Robust execution strategies for project scheduling with unreliable resources and stochastic durations (Q906557) (← links)
- The project scheduling problem with production and consumption of resources: a list-scheduling based algorithm (Q967432) (← links)
- Theoretical aspects of multicriteria flight gate scheduling: Deterministic and fuzzy models (Q983626) (← links)
- Fast reoptimization for the minimum spanning tree problem (Q988691) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- The resource-constrained activity insertion problem with minimum and maximum time lags (Q1041351) (← links)
- Reoptimization of minimum and maximum traveling salesman's tours (Q1044031) (← links)
- Computing latest starting times of activities in interval-valued networks with minimal time lags (Q1044116) (← links)
- Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem (Q1129955) (← links)
- An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations (Q1265850) (← links)
- Modelling setup times, process batches and transfer batches using activity network logic (Q1266699) (← links)
- Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application (Q1291582) (← links)
- A branch and bound algorithm for a single-machine scheduling problem with positive and negative time-lags (Q1293191) (← links)
- A branch and bound algorithm for the resource-constrained project scheduling problem (Q1296084) (← links)
- A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations (Q1303751) (← links)
- Heuristics for scheduling resource-constrained projects in MPM networks (Q1331566) (← links)
- An exact algorithm for project scheduling with multiple modes (Q1372766) (← links)
- Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production (Q1372767) (← links)
- Branch and bound methods for scheduling problems with multiprocessor tasks on dedicated processors (Q1372768) (← links)
- Network scheduling techniques for construction project management (Q1374467) (← links)
- Lower bounds for resource-constrained project scheduling problems. (Q1399575) (← links)
- Order-based neighborhoods for project scheduling with nonregular objective functions. (Q1399577) (← links)
- Resource-constrained project scheduling: A survey of recent developments. (Q1406618) (← links)
- Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints (Q1590046) (← links)
- Resource-constrained project scheduling with flexible resource profiles in continuous time (Q1652311) (← links)
- Optimizing version release dates of research and development long-term processes (Q1751861) (← links)
- Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems (Q1754108) (← links)
- A hybrid framework for over-constrained generalized resource-constrained project scheduling problems (Q1768898) (← links)
- Scheduling of continuous and discontinuous material flows with intermediate storage restrictions (Q1772851) (← links)
- Resource-constrained project scheduling: Notation, classification, models, and methods (Q1806880) (← links)
- Resource levelling for projects with schedule-dependent time windows (Q1806946) (← links)
- The multi-mode resource-constrained project scheduling problem with generalized precedence relations (Q1807061) (← links)
- Deterministic job-shop scheduling: Past, present and future (Q1807948) (← links)