Pages that link to "Item:Q3706870"
From MaRDI portal
The following pages link to Critical path planning under uncertainty (Q3706870):
Displaying 19 items.
- An adaptive crashing policy for stochastic time-cost tradeoff problems (Q342024) (← links)
- Time-cost trade-off analysis of project networks in fuzzy environments (Q421542) (← links)
- Modeling stochastic project time-cost trade-offs with time-dependent activity durations (Q440901) (← links)
- Project bidding under deterministic and probabilistic activity durations (Q721677) (← links)
- Optimization models and a GA-based algorithm for stochastic time-cost trade-off problem (Q732489) (← links)
- Using a risk-based approach to project scheduling: a case illustration from semiconductor manufacturing (Q928039) (← links)
- A heuristic procedure for solving the dynamic probabilistic project expediting problem (Q948658) (← links)
- New fuzzy models for time-cost trade-off problem (Q975376) (← links)
- A decomposition-based stochastic programming approach for the project scheduling problem under time/cost trade-off settings and uncertain durations (Q991368) (← links)
- Bounding the expected time-cost curve for a stochastic PERT network from below (Q1121790) (← links)
- A classified bibliography of recent research relating to project risk management (Q1127233) (← links)
- Sample-path optimization of convex stochastic performance functions (Q1363424) (← links)
- Improving project cost estimation by taking into account managerial flexibility (Q1590029) (← links)
- Project scheduling under uncertainty: survey and research potentials (Q1772834) (← links)
- Expectation and Chance-Constrained Models and Algorithms for Insuring Critical Paths (Q3117319) (← links)
- Min-Max Regret Version of the Linear Time–Cost Tradeoff Problem with Multiple Milestones and Completely Ordered Jobs (Q3455883) (← links)
- Cost/time trade-off analysis for the critical path method: a derivation of the network flow approach (Q4383676) (← links)
- Project management in a competitive environment: interdicting a CPM based project and its implications (Q5002227) (← links)
- The contractor time–cost–credit trade‐off problem: integer programming model, heuristic solution, and business insights (Q6090500) (← links)