Cost/time trade-off analysis for the critical path method: a derivation of the network flow approach (Q4383676)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Cost/time trade-off analysis for the critical path method: a derivation of the network flow approach |
scientific article; zbMATH DE number 1138528
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Cost/time trade-off analysis for the critical path method: a derivation of the network flow approach |
scientific article; zbMATH DE number 1138528 |
Statements
Cost/time trade-off analysis for the critical path method: a derivation of the network flow approach (English)
0 references
2 April 1998
0 references
project management
0 references
critical path analysis
0 references
minimum cost network flow
0 references
minimum capacity cut-set
0 references