Pages that link to "Item:Q395132"
From MaRDI portal
The following pages link to Capacity and inventory planning for make-to-order production systems. The impact of a customer required lead time distribution (Q395132):
Displaying 5 items.
- Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates (Q421585) (← links)
- Trade-off between capacity invested and inventory needed (Q1043340) (← links)
- Measurement and optimization of responsiveness in supply chain networks with queueing structures (Q1694322) (← links)
- Periodic capacity management under a lead-time performance constraint (Q1936596) (← links)
- (Q3656203) (← links)