Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates - MaRDI portal

Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates (Q421585)

From MaRDI portal





scientific article; zbMATH DE number 6035046
Language Label Description Also known as
English
Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates
scientific article; zbMATH DE number 6035046

    Statements

    Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates (English)
    0 references
    0 references
    0 references
    14 May 2012
    0 references
    manufacturing
    0 references
    queuing
    0 references
    inventory
    0 references
    investment analysis
    0 references

    Identifiers