Pages that link to "Item:Q4276605"
From MaRDI portal
The following pages link to Common Cycle Lot-Size Scheduling for Multi-Product, Multi-Stage Production (Q4276605):
Displaying 14 items.
- An optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factors (Q421617) (← links)
- Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case (Q864823) (← links)
- Two hybrid meta-heuristics for the finite horizon ELSP in flexible flow lines with unrelated parallel machines (Q878937) (← links)
- A job-splitting heuristic for lot-size scheduling in multi-stage, multi- product production processes (Q1331612) (← links)
- Cyclic scheduling to minimize inventory in a batch flow line (Q1331620) (← links)
- The inventory replenishment planning and staggering problem: a bi-objective approach (Q1653354) (← links)
- Reformulation, linearization, and a hybrid iterated local search algorithm for economic lot-sizing and sequencing in hybrid flow shop problems (Q1725606) (← links)
- A computational comparison of cyclical and non-cyclical control for stochastic production-inventory systems (Q3055350) (← links)
- Heuristics for the<i>N</i>-product,<i>M</i>-stage, economic lot sizing and scheduling problem with dynamic demand (Q3369501) (← links)
- A genetic algorithm for solving the economic lot scheduling problem in flow shops (Q3518466) (← links)
- Competitive methods for multi-level lot sizing and scheduling: tabu search and randomized regrets (Q4230222) (← links)
- The two-group heuristic to solve the multi-product, economic lot sizing and scheduling problem in flow shops. (Q5928378) (← links)
- The multi-product, economic lot-sizing problem in flow shops: The powers-of-two heuristic (Q5945322) (← links)
- Rotation cycle schedulings for multi-item production systems. (Q5952441) (← links)